What's new in version 2602.6.0.0
Process Manufacturing
•
Release Note
•
5/27/2026
•
Resolved issues
The following issues have been resolved in this release.
| ID | Description |
|---|---|
| 368093 | The system posts duplicate backward-flushed consumption when changing a production order to Finished while the Backflush on Lot Number toggle on the Process Manufacturing Setup page is turned on . This issue occurs when a backward-flushed component already has a remaining quantity of zero, causing the full expected quantity to be posted again as additional consumption in the item ledger entries. |
| 370797 | An error occurs when running the Create Consolidated Production Movement report when the Bin Code filter value exceeds 20 characters. |
| 355254 | The system ignores negative consumption item ledger entries created during the reversal process when posting co-product reallocation on the Production Journal page. As a result, the system incorrectly calculates co-product costs during co-product reallocation. |