Set up graphical scheduler view
Production Scheduling
•
Article
•
2/2/2026
•
Graphical scheduler views define how the scheduler loads and displays operations, including grouping, date window logic, formatting, and indicators.
To set up graphical scheduler View, follow these steps.
- Select the Search icon
, enter Graphical Scheduler View List, and then choose the related link.
The Graphical Scheduler View List page opens. - Create a new view or copy an existing view.
This creates the base configuration. -
Enter the required information in the following fields.
Field Description Code Specifies the unique code for this view configuration. Description Specifies a description for this view configuration. View Type Specifies the view type that will be used in the graphical scheduler, view by production order and view by work center. Default Time Scale Level Specifies the default time scale level when opening this view. Start Date Mode Specifies whether the scheduler uses absolute dates or relative date calculations. Start Date Specifies the absolute start date for the view. Only used when the Start Date Mode field value is set to Absolute. End Date Specifies the absolute end date for the view. Only used when the Start Date Mode field value is set to Absolute. Start Date Formula Specifies the relative date formula used to calculate the start date. Only used when the Start Date Mode field value is set to Relative. End Date Formula Specifies the relative date formula used to calculate the end date. Only used when the Start Date Mode field value is set to Relative. Grid Font Size Specifies the font size for grid columns. Row Height Specifies the default row height in pixels for this view. Past Due Color Specifies the color for tasks that are late relative to the due date. Downtime Color Specifies the color used for downtime tasks. Draft Shade Specifies the level of shade applied for draft records. Lock Brightness Specifies the level of brightness applied for locked records. Include Flexibility Icons Specifies whether to show flexibility icons in the scheduler. Material Shortage Icon Specifies the icon applied when a record has a material shortage. Maintenance/Downtime Icon Specifies the icon applied for maintenance or downtime. Upstream Link Icon Specifies the icon applied for upstream production order links. Downstream Link Icon Specifies the icon applied for downstream production order links. Show Progress Specifies whether to show a progress bar visualization. Show Utilization Column Specifies whether to show the utilization column in work center view. Near Capacity Start % Specifies the threshold for “near capacity” utilization. Capacity Limit % Specifies the threshold for “overloaded” utilization. Overloaded Limit % Specifies the threshold for “severely overloaded” utilization. Underutilized Color Specifies the background color for underutilized state. Nearing Capacity Color Specifies the background color for nearing capacity state. Overloaded Color Specifies the background color for overloaded state. Severely Overloaded Color Specifies the background color for severely overloaded state. -
Close the page.
The view is saved and can be selected in the scheduler.