Create production order links manually

Production Order Linkage  •  Article  •  2/2/2026  • 

To create a link from the upstream production order, follow these steps:

  1. Select the Search icon , enter Production Orders, and then choose the related link.

    The Production Orders page opens.

  2. Open the production order which supplies the output (upstream).

  3. On the Lines FastTab, select the production order line that produces the item to be linked.
  4. On the action bar, select Order Link Tracking Lines.
    The Order Link Tracking Lines page opens.
  5. On the action bar, select New to create an upstream link where this order supplies downstream orders.
  6. In the Linked Production Order No. field, select the downstream production order number.
  7. In the Linked Line No. field, select the downstream production order line number.
  8. In the Linked Component Line No. field, select the specific component line that will consume the upstream output.
  9. In the Allocated Quantity (Base) field, enter the quantity to allocate from this upstream line to the downstream component. You can view the calculated allocated ratio %.
  10. Close the Order Link Tracking Lines page to save the link.