Create production order links manually
Production Order Linkage
•
Article
•
2/2/2026
•
To create a link from the upstream production order, follow these steps:
-
Select the Search icon
, enter Production Orders, and then choose the related link.The Production Orders page opens.
-
Open the production order which supplies the output (upstream).
- On the Lines FastTab, select the production order line that produces the item to be linked.
- On the action bar, select Order Link Tracking Lines.
The Order Link Tracking Lines page opens. - On the action bar, select New to create an upstream link where this order supplies downstream orders.
- In the Linked Production Order No. field, select the downstream production order number.
- In the Linked Line No. field, select the downstream production order line number.
- In the Linked Component Line No. field, select the specific component line that will consume the upstream output.
- In the Allocated Quantity (Base) field, enter the quantity to allocate from this upstream line to the downstream component. You can view the calculated allocated ratio %.
- Close the Order Link Tracking Lines page to save the link.